INSTALLATION
Wall drilling and bracket fixing
Wall marking:
? Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the
centre of the area in which the hood will be installed.
Draw a horizontal line at 650 mm above the hob.
Place br7.2.acketon t1 he wall as shown about 1-2 mm from the ceiling or upper limit align-
ing the centre (notch) with the vertical reference line.
Mark the wall at the centres of the holes in the bracket.
Place br7.2acket.on 1 the wall as shown at X mm below the first bracket (X = height of the
upper chimney section supplied), aligning the centre (notch) with the vertical line.
Mark the wall at the centres of the holes in the bracket.
Mark a reference point as indicated at 116 mm from the vertical reference line and 330 mm
above the horizontal reference line.
Repeat this operation on the other side.
Drill o 8 mm holes at all the centre points marked.
Insert the wa11ll plug in thes holes.
Fix the lower b7.2.racketusing1 the12a screws (4,2 x 44,4) supplied.
Fix the upper b7.2.racket1 and the air outlet connect7.3 ioton sugetppheror ut sing the 2
screw12as ( 4,2 x 44,4) supplied.
Insert the tw12ao scre (4,2 xws 44,4) supplied in the hood body fixing holes, leaving a gap
of 5-6 mm between the wall and the he ad of the screw.
5
EN 5 |