(Initial screen)(Executing screen)(Initial screen)(Executing screen)
Sim4-3 OUTPUT CHECKSim4-3 OUTPUT CHECKSim5-2 HEATER LAMPSim5-2 HEATER LAMP
1:LUM2 4:TRC27:CPFC3 10:LUM4
2:CPFC2 5:DM8:CPFS3 11:CPFC4
3:CPFS2 6:LUM39:TRC3 12:CPFS4
1/2 EXEC2/2 EXEC 8PRESS OK KEY EXEC EXEC
1:LUM22nd cassette lift-up motor
2:CPFC22nd cassette pick-up solenoid5-3
3:CPFS22nd cassette paper feed clutch
PurposeOperation test/check
4:TRC22nd cassette transport roller clutch
Function Used to check the operation of the copy lamp and the
5:DM2nd cassette paper transport motor (3rd cassette paper (Purpose)control circuit.
transport motor)
SectionOptical (Image scanning)
6:LUM33rd cassette lift-up motor
ItemOperation
7:CPFC33rd cassette pick-up solenoidOperation/procedure (Pattern 8)
8:CPFS33rd cassette paper feed clutch
Press the [OK] key.
9:TRC33rd cassette transport roller clutch
The copy lamp lights up for 10 sec.
10:LUM44th cassette lift-up motor
(Initial screen)(Executing screen)
11:CPFC4 4th cassette pick-up solenoid
Sim5-3 COPY LAMPSim5-3 COPY LAMP
12:CPFS4 4th cassette paper feed clutch
The motor for 10sec, the solenoid ON for 500msec, OFF for 500msec.
The lift-up motor operates only when the tray is opened. (20 times)
PRESS OK KEY EXEC EXEC
Note: Execution is possible only when the option cassette is installed.
When 10 sec passed, the copy lamp is turned OFF.
5
6
5-1
PurposeOperation test/check6-1
Function Used to check the operation of the display, LCD in the
PurposeOperation test/check
(Purpose)operation panel, and control circuit.
Function Used to check the operation of the loads (clutches and
SectionOperation (screen/operation)
(Purpose)solenoids) in the paper transport system and the
ItemOperationcontrol circuit.
Operation/procedureSectionPaper transport (Discharge/Switchback/Transport)
The LCD is displayed as follows. (All LEDs are ON.)ItemOperation
(Initial screen)Operation/procedure (Pattern 9)
With the upper half section highlighted,
Sim5-1 LCD/LED CHK.The names of the loads which can be operated are displayed. Select
contrast changes "Standard ? MAX ? MIN." in
the load to be checked with the 10-key.
every 2sec.
(Initial screen)(Executing screen)
Sim6-1 OUTPUT CHECKSim6-1 OUTPUT CHECK
1:LUM1 4:MPFS7:OGS 10:CPFS2
(6 sec later)2:CPFC1 5:RRC
8:LUM2 11:TRC2
With the lower half section highlighted, contrast 3:CPFS1 6:PSPS9:CPFC2
Sim5-1 LCD/LED CHK.
changes "Standard ? MAX ? MIN." in every 1/2 EXEC2/2 EXEC 8
2sec.
1:LUM11st cassette lift-up motor
2:CPFC11st cassette pick-up solenoid
(6 sec later)3:CPFS11st cassette paper feed clutch
The back light changes in the sequence of 4:MPFSManual feed pick-up solenoid
Sim5-1 LCD/LED CHK.
"OFF ? Red ? Yellow ? Green" every 2 5:RRCResist roller clutch
seconds.6:PSPSSeparation pawl solenoid
7:OGSPaper exit gate switching solenoid
8:LUM22nd cassette lift-up motor
9:CPFC22nd cassette pick-up solenoid
5-210:CPFS2 2nd cassette paper feed clutch
11:TRC22nd cassette transport roller clutch
PurposeOperation test/check
12:LUM33rd cassette lift-up motor
Function Used to check the operation of the heater lamp and the
13:CPFC3 3rd cassette pick-up solenoid
(Purpose)control circuit.
14:CPFS3 3rd cassette paper feed clutch
SectionFixing (Fusing)
15:TRC33rd cassette transport roller clutch
ItemOperation
16:LUM44th cassette lift-up motor
Operation/procedure (Pattern 8)
17:CPFC4 4th cassette pick-up solenoid
Press the [OK] key.
18:CPFS4 4th cassette paper feed clutch
ON/OFF operation of the heater lamp is repeated 5 times in an intervalThe motor for 10sec, the solenoid ON for 500msec, OFF for 500msec.
of 500ms.
(20 times)
The lift-up motor operates only when the tray is opened.
AR-235/275 SIMULATION - 9 |