5-1-4. CHECK AND ADJUSTMENT
YWhen the parts of the tape path (tape guide, reel table, etc.) have been removed or parwing parts hatsve been replaced, adjust the follo
according to the flowchart below.
Y ADJUSTMENT POSITION
TG3TG6
(Tracking entrance, curl)(Tracking exit, curl)
TG2
TG7
(TG2 height/FWD height, curl)(TG7 height/RVS position, curl)
TG1Spring hook slider
(TG1 height, curl)(RVS back tension)
TG8
(TG8 height, curl)
Spring hook slider
(FWE back tension)
T band adjuster
S band adjuster
(RVS position)
(FWD position)
RV3
Reel table
RV1
RV1 to 4 (MD-76 board)(height)
RV4
(TG2/7 electric tension regulator)
RV2
Y ADJUSTMENT ORDER (FLOWCHART)
ADJUSTMENT START -1
ADJUSTMENT START -24-1. REEL TABLE HEIGHT CHECK AND ADJUSTMENT
If the TG1/8 guide is not
replaced and removed,
4-2. TG1/8 HEIGHT CHECK AND ADJUSTMENT
proceed to TG2/7 height
adjustment.
4-3. TG2/7 HEIGHT CHECK AND ADJUSTMENT
4-4. FWD/RVS POSITION CHECK AND ADJUSTMENTADJUSTMENT START -3
When only the TG1/8 guide
is replaced, perform tape 4-5. TG2/7 ELECTRIC TENSION REGULATOR CHECK AND ADJUSTMENT
path adjustment after height
adjustment.4-6. FWD/RVS BACK TENSION CHECK AND ADJUSTMENT
ADJUSTMENT START -4
4-7. PREPARATION FOR ADJUSTMENT AND TAPE PATH CHECK
4-8. TRACK ADJUSTMENT AND CHECK
4-9. TRACK CHECK
4-10. CUE/REV CHECK
Tape Path Adjustment
4-11. CURL CHECK AND CURL ADJUSTMENT
4-12. RISING CHECK
ADJUSTMENT END