BOSCH CLOTHES DRYER6) Remove the top panel and back 8) Use a Torx T20 driver to remove the
panel, being careful to remove thefour screws shown in Figure 4. SetGAS CONVERSION KIT
power cord from the back panel as the screws aside for reinstallation
INSTRUCTIONSshown in Figure 2.later.
1. Materials Supplied
Figure 2Figure 4
LP gas valve
Label, Rating Plate
Label, Conversion Record
Instructions
2. Materials Needed
Torx T20 driver
1? open-ended wrench
Torque Wrench (English or metric)
Torque Screwdriver (English or metric)
3. Procedure
1) Turn off the gas supply to the
dryer.7) Pull the tension lever to the right as
2) Disconnect the electrical power toshown by the arrow in Figure 3,
the dryer.and remove the belt from the drive
3) Disconnect the gas connectionpulley.
from the dryer.
4) Move the dryer away from the wall.Figure 3
5) Use a Torx T20 driver to remove
the screws on the back of the dryer
that secure the top panel and back
panel as shown in Figure 1. Set the
screws aside for reinstallation later.
Figure 1
9) Lift and remove the drum/hood
assembly as shown in Figure 5.
Figure 5
10) Carefully set the drum/hood
assembly aside.
2 |