DISASSEMBLY INSTRUCTIONS-2/6
3. MD C.B
1) Remove the eight WIRES from the mechanism chassis by a soldering iron.
2) Remove the two screws, the SCREW A (VT2+2-6) and the SCREW B (S-SCREW, VTT2-15).
3) Disengage the detent C in the three locations and lift up the MD C. B.
4) Short-circuit the SHORT LAND of the pick-up. (Fig. 3-2)
5) Disconnect the FFC of the pick-up and remove the MD C. B. (Fig. 3-2)
Fig.3-2
Fig.3-1
Notes for assembling
1) Remove the short-circuit of the pick-up by unsoldering.
2) Ensure that the four switches are located correctly. (Fig. 3-3 a, Fig. 3-3 b, Fig. 3-3 c)
3) Ensure that the FFC of the pick-up is not pinched between the LOADING MOTOR and the PWB. (Fig. 3-4)
4) Ensure that the WIRES are connected with the mechanism chassis properly by soldering. (Fig. 3-5)
5) Ensure that the WIRE has an allowance so that the routing range of the WIRE OWH can be secured. (Fig. 3-6)
Fig.3-3 a
Fig.3-3 b
Fig.3-3 c
Fig.3-5
Fig.3-4Fig.3-6
- 4 - |