AH-X075E/X095E
AU-X075E/X095E
AY-X075E/X095E
AE-X075E/X095E
6. After closing the open panel, open the vertical adjustment
9. Remove the control box cover.
louver and pull out the bottom of the front panel towardHolding its bottom, pull and disengage the upper hook
you.toward the bottom.
Lifting the front panel, strongly pull the top toward you.
Making the front panel parallel to the main body, strongly
pull it toward you for removal.
To install the front panel, place the bottom of the front
panel under the open vertical adjustment louver, and
press in the front panel, parallel to the cabinet. When
pressing it in, take care to prevent the top of the blow-out
port of the drain pan from being caught by the front panel.
10.Remove the ground wire. (One screw)
Note:During reassembly, take care for the direction
of the lead wire.
7. Remove the unit-to-unit wiring from the terminal board.
(Loosen the screw with the screwdriver, and pull out the
wiring.)
11.Remove the protect cover for the dew.
Note:During reassembly, verify that the dew on the
pipe is recovered to the drain pan.
8. Remove one fastening screw from the control box cover.
39 |