aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Ducting or Recirculation fitting
" Ducting fitting
" The hood can be ducted to the outside using either rigid or flexible
ducting O 120 or 150 mm, the choice of which is left to the installer.
When 120 mm ducting is to be used it will be necessary to install
AA
the reduction flange item A on the air outlet (fig.5).
" When ducting the hood through the side air outlet from the lower
chimney element I it is necessary to insert deflector D into spigot
R to close off the opening that is not being used (fig.6).
" Cut the additional spigot P in correspondence with outlets 1 and 2
, which must be formed directly on the piece. Connect the additional
spigot P to the round fan outlet, pushing it downwards, and fit
spigot R to additional spigot P in a similar manner (make sure that
the two additional side recirculation spigots P1 are fitted to spigot
R). Make sure that the height of the assembly R + P corresponds
to the height of the chimney outlet (fig. 7).Fig. 5
" If the hood is supplied with the activated charcoal filters
fitted, the filters should be removed (see paragraph onP1P1 P1P1
Maintenance ).
" Recirculation fitting
" The filtered air is returned to the room through the two
plastic side grills G on the lower chimney element I .RR
" Connect the additional spigot P to the round fan outlet,
pushing it downwards, and fit spigot R to additional spigotDD
P in a similar manner (make sure that the two additional
side recirculation spigots P1 are fitted to spigot R). Cut
the additional spigot P in correspondence with outlets 1PP
and 2 , which must be formed directly on the piece. Make
sure that the height of the assembly R + P corresponds
to the height of the chimney outlet.(fig.7).
P1P1P1P1
RR
Fig. 6
PP
GG
Fig. 7
18GB
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa |