1. Attachments
Hose ass'y (With control panel handset and joint pipe)KKKK1
Rug & floor nozzleKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK1
Extension pipeKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK1
Crevice nozzleKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKK1
2. Replacement Instructions
2.1 How to replace the power control board assembly, motor assembly and lead wire
assembly (include triac PWB assembly).
(1)Open the transparent case cover while pressing the button of dust case, and lift out the dust case
from cleaner body.
(2)Take off three tapping screws 4x20(7)(8)and two tapping screws 4x12(9), then the upper case
assembly can be removed.
(3)Take out the power control board assembly(13), motor assembly(18) and lead wire assembly(16)
from the lower case .
(4)Release the triac PWB assembly by taking off the lower case.
2.2 How to replace the power cord
(1)Open the transparent case cover while pressing the button of dust case,and lift out the dust case
from cleaner body.
(2)Take off three tapping screws 4x20(7)(8) and two tapping screws 4x12(9), then the upper case
assembly can be removed.
(3)Take out the cord reel assembly from the lower case .
(4)After rotate the cord reel assembly anticlockwise several times by pushing the C pedal to release prewind
of cord reel, take of a tamper proof screw 4x16 and three tapping screws 4x16 can be taken out.
C pedalThree tapping screws 4x16
Tamper proof screw 4x16
Cord reel assembly
(5)Pass the power cord through the upper case assembly and cord inlet.
Upper case assembly
Cord inlet
(6)After assembly, wind a spring 5 times before set. |