Figure 13 bottom flange. Now, starting at the lower
corner of the cabinet, apply seal strips over
the center line of the pre-drilled holes for one
of the side mounting angles, over the center
line of pre-drilled holes for the top mounting
channel, and over the center line of pre-drilled
holes for the other side mounting angle. (See
Figure 16.)
Figure 16 \
c
4
3 l Remove front panel by pushing top down
and pulling toward you (see Figure 14). This
protects the panel from damage and makes
the air conditioner easier to handle during
installation.
Figure 14
b
6 a Attach side mounting angles to the sides of
the cabinet by using four hex-head sheet
metal screws. (See Figure 17 .) Insert bottom
screws first. Be sure flange of each side
mounting angle faces inside. Now attach top
mounting angle to cabinet by using three hex-
head sheet metal screws, Again, be sur e tallest
flange is facing inside.
Figure 18
MEASURE DISTANCE FROM INSIDE
GROUND WIRE SCREW ?HANDLE
4 . Slide unit out of cabinet. First, disconnect the
green ground wire at the left-front corner of
base of unit by Iremoving retaining screw (save
screw for reuse later). Now slide unit out of
cabinet by pulling out on handle on bottom
(see Figure 15).
5 o Attach seal stri;)s to cabinet. Place 3/8? wide
self-adhering st & strip or window side of |