DECK MECHANISM DISASSEMBLY
(S10)
GEAR SLIDER
GEAR MAIN
(S12)
Fig.(B)
GEAR UP/DOWN
GEAR EXCHANGE(S11)
(S13)
GEAR LOADING
(S15)Fig.(C)
MOTOR ASSEMBLY MAIN(S15)
GEAR WHEEL MAIN
(S14)
BASE MAIN
MOTOR ASSEMBLY MAIN
(L4)
(C8)(C9)
MODE SWITCH
Fig.(A)
(S9)
PCB ASSEMBLY MAIN MODE
(S9)
(S9)
Fig. 4-4
4. Base Assembly Main(Fig. 4-4)
Note
Note
Y When reassembling, align the (A) position of the Gear Main
Y Put the Base Assembly Main face down(Bottom Side).to the (B) position of Mode Switch as Fig.(B)
4-1. PCB Assembly Main Mode4-5. Gear Up/Down
1) Release Screw(S13).
1)Unconnect the Connectors (C8), (C9).
2)Release three Screws(S9).
Note
Note
Y Reassembling, turn the Gear Up/Down in direction of arrow
Y When reassembling, align the Mode Switch position asas Fig.(C).
Fig.(A).
4-6. Gear Wheel Main
Y Put the Base Assembly Main on original position(Top Side)
1) Release Screw(S14).
4-2. Gear Slider
4-7. Gear Loading
1) Release Screw(S10).
4-8. Motor Assembly Main
4-3. Gear Exchange
1) Release 2 Screws(S15).
1) Release Screw(S11).
2) Unlock the Locking Tab(L4).
4-4. Gear Main
4-9. Base Main
1) Release Screw(S12).
26 |