7. Wiring diagram
Wiring the circuit power source/ballast power source boards, and the control main board (When assembling board sub-assembly)
Wiring circuit power source board
(1) Connect TSW .Wiring ballast power source board
(2) Connect CNPOW.(1) Connect CNBAR.WARNING
(3) Connect CNPWR, and install FEB1.(2) Install FEB2.
(3) Wire CNBAR and #6800.Instractions in this chapter are based on the standards
Confirm that CN102 and CN103 are securely connected.and/or the laws. Deviation from instructions could be
(This cannot be confirmed downstream.)against the standards and/or the laws. Always put
together according to these instructions.
CN102
CNPOWCN103CP-S335(C9SM)/CP-X340, PJ552 (C9X)/CP-X345, PJ562 (C9XM)
#6800 Outside air temperature sensor
Confirm that CNBAR is securely
* The FEB2 style shall be as shown below.connected to CN2.
* Orient the FEB2 protrusion inward.
WARNING(This cannot be confirmed downstream.)
* Keep the lamp lead extra length to a minimum.
Confirm that the
CNBAR
TSW is printed
with YS11A120A-**.
FEB2
30TSW
CN2
CN101
FEB1
Z1
Completely lock when connecting
CNPWR connector to CN101.FEB2WARNING
Follow there instructions to keep
WARNING
adequate distance for insulation
between the primary and the
Install FEB1 (ferrite core) to CNPWR.
secondary side.
Completely lock the tabs when installing FEB1.
As shown in the drawing below, secure to CNPWR with Z1 Route #6800 and CNBAR
(tie band). (Always cut off Z1 extra length, leaving 2~3mm.)through the cutaway hole
in the sheet before installing
The bending length shall be Fastener
ballast. (Routing under the
555mm.
sheet is difficult after installing
the ballast power source.)
CNPWRFEB1
Lay #6800 and CNBAR to
eliminate sag.
Route #6800 and CNBAR
between the sheet and case,
through the fastener, and lock
them.
Wiring diagram 1 (C9SM/C9X/C9XM) |