132994830.qxd 11/27/02 9:32 AM Pagina 5 (Nero/Process Black pellicola)
Installation
Unpacking5. Set the machine upright and remove the
remaining rear screw. Slide out the relevant pin.
All transit bolts and packing must be removed6. Plug all the holes with the plugs which you will
before using the appliance.find in the envelope containing the instruction
manual.
You are advised to keep all transit devices so that
they can be refitted if the machine ever has to be
transported again.
1. Using a spanner, unscrew and remove the two
rear bottom screws. Slide out the two plastic pins.
Lay the machine on its back, taking care not to
squash the hoses. This can be avoided by
placing one of the corner packing pieces between
the machine and the floor.
Positioning
Install the machine on a flat hard floor.
Make sure that air circulation around the machine is
not impeded by carpets, rugs etc. Check that the
machine does not touch the wall or other kitchen
units.
Carefully level by screwing the adjustable feet in or
out. Never place cardboard, wood or similar
2. Remove the polystyrene blocks from the bottommaterials under the machine to compensate for any
of the machine and release the two plastic bags.
3. Very carefully slide out the left polythene bag,unevenness in the floor.
removing it towards the right and then
downwards.
Water inlet
The inlets on the back of the appliance are colour
4. Very carefully slide out the right polythene bag,coded, blue for cold and red for hot.
removing it towards the left and then upwards.Connect the red marked hose to hot water and the
other hose to cold water tap.
The other end of the inlet hose which connects to the
machine can be turned in any direction. Simply
loosen the fitting, rotate the hose and retighten the
fitting, making sure there are no water leaks.
5 |