Insulation test, English - German 7.1
INSULATION TEST
Each set must be insulation tested after having been dismantled.
Make the test when the set has been reassembled and is ready to be returned to
the customer.
Flashovers must not occur during the testing procedure!
Make the insulation test as follows:
Short-circuit the two pins of the mains plug and connect them to one of the
terminals of the insulation tester. Connect the other terminal to ground on the
VHF/UHF aerial socket.
NOTE!
To avoid damaging the set it is essential that both terminals of the insulation tester
have good contact.
Slowly turn the voltage control of the insulation tester until a voltage of 2.5 kV is
obtained. Maintain that voltage for one second, then slowly turn it down again.
ISOLATIONSPR�FUNG
Nach einer Zerlegung ist bei jedem Gert eine Isolationsprfung vorzunehmen. Die
Prfung wird dann ausgefhrt, wenn das Gert wieder vollstndig
zusammengebaut und zur Auslieferung an den Kunden bereit ist.
berschlge drfen whrend der Prfung nicht vorkommen!
Die Isolationsprfung in folgender Weise durchfhren:
Die beiden Steckerstifte am Netz-stecker kurzschlieen und an eine der
Anschluklemmen des Isolationsprfers anschlieen. Die andere Anschluklemme
an die Masse des VHF/UHF Antennenanschlues anschlieen.
ACHTUNG!
Um Beschdigungen des Gertes zu vermeiden, ist es wichtig, da beide
Anschluklemmen des Isolationsprfers einen sehr guten Kontakt haben.
Die Spannungsregelung des Isolationsprfers langsam nach oben drehen, bis eine
Spannung von 2,5 kV erreicht wird. Diese Ein-stellung 1 Sekund aufrechterhalten,
und anschlieend die Spannung wieder langsam nach unten drehen. |