5) Shift up the stack delivery roller (upper) [4], and then push it5) Push up the safety guide [4] from below to free the safety
down to detach the stack deliver roller (upper) [4].guide [4] from the shaft [5].
6) Likewise, remove the stack delivery roller (upper) [6] at the
front.
[4]
[6]
[4]
[5]
6) Remove the paddle [6] in the direction of the arrow.
7) Likewise, remove the other paddle.
(11) Paddle
[6]
1) Remove the paddle assembly. (See B.(4).)
2) Place the paddle assembly [1] as shown.
[1]
(12) Stack Delivery Roller (Lower)/Delivery Belt
1) Remove paddle assembly, and separate it from the processing
tray assembly. (See B.(4).)
2) Slide the aligning plate (front) [2] and the aligning plate (rear)
3) Turn the gear [2] in the direction of the arrow to move up the[3] of the processing tray assembly [1] by sliding them to the
stack delivery roller assembly (upper) [3].outside.
[1]
[3]
[3]
[2]
3) Remove the processing tray stopper [4].
[4]
[2]
4) Push up the safety guide [4] from below to free one side of the
safety guide [4] from the shaft [5].
4) Remove the screw [5], and detach the paper guide (front) [7]
while freeing the two claws [6].
[5]
[7]
[6]
[5]
[4]
MX-FNX2/AR-PN1/MX-RBX1 DISASSEMBLY AND ASSEMBLY 6 - 9 |