2-2. Tension Post Position
Adjustment
1. Turn the adjustment piece on the Pad Arm Unit fully
counterclockwise.
2. Turn the Mode Gear to set the Mechanism position in
the play mode, that the Soft Brake of the Pad Arm
Unit just touch to the Supply Reel Table as shown in
Fig.M44.
3. Set the Mechanism Plate on the Mechanism Chassis
as shown in Fig.M44.
4. Turn the adjustment piece on the Pad Arm Unit
clockwise slowly until the surface of the Tension Post
comes to 2nd step. Set the Mechanism Plate as
shown in Fig.A12. in Fig.A9.
Figure M45
2-4. Confirmation of Tape Pass
Figure M44
5. After adjustment, turn the Mode Gear to unloading
direction then turn back to loading direction, and
make sure that position is correct at above
specification in Play position.
Figure M46
2-3. Supply & Take-up Reel Table
AdjustmentPlay back the cassette tape and confirm that the tape
This adjustment should be performed for Supply or Take-pass without curling at the upper and lower guides of the
up Reel Table one by one.following posts in the Play and REV modes as shown in
1. Turn the adjustment screw (A) on top of the SupplyFig.M47.
or Take-up Reel Table fully clockwise. Then, place
the Mechanism Plate on the Mechanism Chassis as
shown in Fig.M41.
2. Hold the Mechanism plate by finger and slowly turn
the adjustment screw counterclockwise until Reel
Table just rotate with adjustment screw as shown in
Fig.M45.
3. Remove the Mechanism Plate and hold the Reel
Table by finger then turn the adjustment screw
counterclockwise to 45 degrees from above step
point.
MEC- 13 |