Installation
IMPORTANT: This hob must be installed by a
competent person to the relevant Gas Standards.
Any gas installation must be carried out by a
competent person.
The manufacturer will not accept liability, should
the above instructions or any of the other safety
instructions incorporated in this book be ignored.
WHEN THE HOB IS FIRST INSTALLED
Once the hob has been installed, it is important to
remove any protective materials, which were put
on in the factory.
On the end of the shaft, which includes the G 1/2"
threaded elbow, adjustment is fixed so that the washerFO 0814
is fitted between the components as shown in the
diagram. Screw the parts together without using
excessive force.
Gas ConnectionFO 0264
Connection to the gas supply should be with either rigidA) End of shaft with nut
or semi-rigid pipe, i.e. steel or copper.B) Washer
The connection should be suitable for connecting to RC) Elbow
1/2" (1/2 BSP male thread).
It is important to install the elbow correctly, with
When the final connection has been made, it is essentialthe shoulder on the end of the thread, fitted to the
that a thorough leak test is carried out on the hob andhob connecting pipe.
installation. Ensure that the main connection pipe doesFailure to ensure the correct assembly will cause
not exert any strain on the hob.leakage of gas.
Cut Out SizeRectangular cut-out size for hob
The dimensions of the cut-out are given in the diagram.
Dimensions are given in mm.
FO 2038
10 |