7. Install the vent system according to the method needed. Use 10. Measure the thickness of the cabinet floor, including the filler
caulking to seal the exterior wall or roof opening.strips, if used. If the thickness is less than uD?" (15.9 mm),
8. Determine wiring knockout.install wood filler strips that are a minimum length of
5" (12.7 cm) onto the cabinet floor. The mounting bracket
To wire through the top wiring knockout:adjusts from uD?" (15.9 mm) to 21D?" (54 mm) for the wood filler
Measure and mark a parallel line either 10uD?" (27 cm) for the strips.
30" (76.2 cm) hood or 11uD?" (29.5 cm) for the 36" (91.4 cm)
hood to the right of the centerline on the cabinet ceiling. Mark A
a point on this line that is 4" (10.2 cm) from the back wall of
the cabinet. Drill a 11D?" (3.2 cm) diam. hole through the
cabinet ceiling.
A
B
A.Less than uD?" (15.9 mm)
B.Wood fillers (thickness as required)
WARNING
Excessive Weight Hazard
A. Wiring cutoutUse two or more people to move and install
range hood.
To wire through the rear wiring knockout:
Failure to do so can result in back or other injury.
Measure and mark a parallel line 113D?" (29.8 cm) for the
30" (76.2 cm) hood or 143D?" (36.5 cm) line for the
36" (91.4 cm) hood to the right of the centerline on the 11. Remove the vent hood from the carton. Attach the damper to
cabinet back wall. Mark a point on this line that is 81D?" (21 cm) the vent opening. If the roof cap or wall cap has a damper, do
from the bottom of the cabinet. Drill a 11D?" (3.2 cm) diam. not attach the damper to the vent hood.
hole through the wall.
A
A
A. Damper
A. Wiring cutout12. Remove the top or rear knockout from the wiring opening,
9. Run the wiring through the wall or cabinet according to the depending on which one will be used.
national Electrical Code and all local codes and ordinances.A
Use caulking to seal around wire opening.
NOTE: Do not turn on power until installation is complete.
A. Wiring knockouts
9 |