Installation
Rectangular cut-out size for hob
The hob must be installed according to the
instructions supplied.
The hob must be installed by qualified
580
personnel to the relevant British Standards.500
Please, ensure that, once the hob is installed,
it is easily accessible for the engineer in the
event of a breakdown.
WHEN THE HOB IS FIRST INSTALLED
Once the hob has been installed, it is important
to remove any protective materials, which were
put on in the factory.
The manufacturer will not accept liability,
550
should the above instructions or any of the470
other safety instructions incorporated in this
book be ignored.
Cut Out Size
55 min.
The dimensions of the cut-out are given in the diagram.
FO 2225
Supply Connections
This hob is designed to be connected to 230-240 V (50
Hz) electricity supply.
The cable used to connect the hob to the electrical supply
ON/OFF SWITCH
1
must be 6mm, PVC twin and earth, and fused to 30amp.
It is necessary that you install a double pole swith
between the hob and the electricity supply (mains), with
a minimum gap of 3mm between the swith contacts and
of a type suitable for the required load in compliance
FLEX
with the current rules.OUTLET
The swith must not break the yellow and green earth
cable at any point.
Building In
FO 0763
Building over a cupboard orON/OFF SWITCH
2
drawer
If the hob is to be installed above a cupboard or drawer it
will be necessary to fit a heat resistant board below the
base of the hob on the underside of the work surface.
It is also recommended to carry out the electrical
connection to the hob as shown in diagrams 1 and 2.
FLEX
OUTLET
FO 0764
11 |