132996780.qxd 9/7/01 8:38 PM Pagina 7 (Nero/Process Black pellicola)
Installation
UnpackingPositioning
Install the machine on a flat hard floor.
All transit bolts and packing must be removed
Make sure that air circulation around the machine isENGLISH
before using the appliance.
not impeded by carpets, rugs etc. Check that the
machine does not touch the wall or other kitchen
You are advised to keep all transit devices so that
units.
they can be refitted if the machine ever has to be
Carefully level by screwing the adjustable feet in or
transported again.
out. Never place cardboard, wood or similar
1. Using a spanner, unscrew and remove the rear
materials under the machine to compensate for any
right-hand bolt and lay the machine on its back,
unevenness in the floor.
taking care not to squash the hoses. This can be
avoided by placing one of the corner packing
pieces between the machine and the floor.
Water inlet
2. Remove the polystyrene block from the bottom of
Connect the water inlet hose supplied with the
the machine and release the two plastic bags.
machine to a tap with a 3/4" thread.
3. Carefully remove the right-hand bag (1) then the
Do not use already employed inlet hoses.
left-hand bag (2) by pulling them towards the
The other end of the inlet hose which connects to the
centre of the machine.
machine can be turned in any direction. Simply
loosen the fitting, rotate the hose and retighten the
fitting, making sure there are no water leaks.
4. Set the machine upright and remove the two
remaining bolts from the back.
5. Pull out the three plastic spacers from the holes
The inlet hose must not be lengthened. If it is too
into which the bolts were fitted.
short and you do not wish to move the tap, you will
6. Plug all the holes with the plugs which you willhave to purchase a new, longer hose specially
find in the envelope containing the instructiondesigned for this type of use.
booklet.
7 |